Results 1 to 1 of 1

Thread: Building Paths Over Lowered Terrain

  1. #1

    Building Paths Over Lowered Terrain

    In some cases when you try to build a path or bridge over lowered terrain, the terrain rises and levels itself out. This makes it difficult to make a bridge over water, or just a hole in general.

    I eventually got it, but it was very difficult and sometimes it doesn't allow you to lower terrain under certain parts of a path causing this weird terrain spiking.

    I can take pictures or videos but it's quite easy to replicate.

    EDIT: I'm having a hard time removing water now.. It doesn't seem to want to go away.
    Last edited by jibbyjab; 03-30-2016 at 08:59 PM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
About us
RollerCoaster Tycoon is back! RCTW is the first new entry to the RollerCoaster Tycoon franchise in a decade, bringing an innovative new track builder, and much more.
Join us